Fire Door Replacement Programme for City of London

From manufacturer to building users, everyone plays their part in ensuring a fire door performs as it should’

Gerda Security Products are extremely proud to have led an extensive fire door replacement programme for The City of London Corporation:
– 692 doorsets replaced
– 99.6% resident satisfaction
– 60-minute fire rated doorsets installed (FD60(S) and SHR60 ranges).

GSP were appointed as the main contractor to carry out fire doorset replacement works on the City of London Corporation’s York Way and Holloway estates.

The Corporation’s decision to surpass the mandatory 30-minute requirement and opt for 60-minute doors reflects its unwavering commitment to prioritising safety above all else and using our products is a testament to that commitment.

We are delighted to have been rewarded with the manufacturing and installation of fire doorsets for this project. For more information about how this was done, please see the following article in Inside Housing and our case study on the project: https://lnkd.in/ev8Bi53P https://gerdasecurity.co.uk/case-studies/york-way-holloway-estates-city-of-london/


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *